🌍 Select Country:
Kenya (KSh KES)
Uganda (USh UGX)
Tanzania (TSh TZS)
Rwanda (RF RWF)
Ethiopia (Br ETB)
Nigeria (₦ NGN)
Ghana (GH₵ GHS)
South Africa (R ZAR)
Egypt (E£ EGP)
United States ($ USD)
United Kingdom (£ GBP)
European Union (€ EUR)
India (₹ INR)
China (¥ CNY)
Japan (¥ JPY)
Australia (A$ AUD)
Canada (C$ CAD)
Brazil (R$ BRL)
Mexico (Mex$ MXN)
Russia (₽ RUB)
Saudi Arabia (SR SAR)
United Arab Emirates (د.إ AED)
Turkey (₺ TRY)
South Korea (₩ KRW)
Singapore (S$ SGD)
Malaysia (RM MYR)
Thailand (฿ THB)
Vietnam (₫ VND)
Philippines (₱ PHP)
Indonesia (Rp IDR)
← Back to Home
🪨 ADVANCED HARD CORE FILLING CALCULATOR
All prices in KES (KSh)
1. FILLING DETAILS
Hardcore Application Type
General Hardcore Fill
Sub-base (Roads)
Foundation Base
Trench Fill
Land Reclamation
For general compaction and leveling
Total Fill Depth (mm)
Typical depth: 150-1000mm
2. VOLUME CALCULATION
Enter Dimensions
Enter Direct Volume
Length (mm)
Width (mm)
Surface Area:
0 m²
Calculated Volume:
0 m³
Enter Volume Directly (m³)
3. LAYER CONFIGURATION
Layer Thickness
150mm (6")
Standard layer thickness
200mm (8")
Heavy duty applications
250mm (10")
Deep fill applications
300mm (12")
Maximum single layer
Number of Layers Required:
1
layers
4. HARD CORE MATERIAL
Select Hardcore Material Type
1.8 t/m³
Crushed Stone
Best for compaction
Rate: KSh 6,500/m³
2.2 t/m³
Concrete Rubble
Recycled concrete
Rate: KSh 3,500/m³
1.9 t/m³
Brick Rubble
Recycled brick material
Rate: KSh 3,000/m³
2 t/m³
Quarry Waste
Quarry by-products
Rate: KSh 2,500/m³
1.7 t/m³
Clean Stone
Washed and graded
Rate: KSh 7,500/m³
Material Cost per m³ (KSh)
Material Density (tons/m³)
Material Quantity Required:
0.0 tons
Material Wastage Percentage
0%
25%
10%
5. COMPACTION SPECIFICATIONS
Required Compaction Rate
85% (Light)
100% (Full)
95%
Compaction Method
Plate Compactor
Coverage: 100 m²/hour
KSh 300/hour
Roller Compactor
Coverage: 300 m²/hour
KSh 800/hour
Vibratory Roller
Coverage: 250 m²/hour
KSh 1200/hour
Manual Compaction
Coverage: 50 m²/hour
KSh 150/hour
Compaction Cost per hour (KSh)
Estimated Compaction Time:
0 hours
Select material type for compaction recommendations
6. LABOR & ADDITIONAL COSTS
Percentage of Materials
Fixed Price per m³
Labor Percentage (%)
Based on material + compaction costs
Labor Cost per m³ (KSh)
Transport Distance (km)
Transport Cost per ton/km (KSh)
Based on material tonnage
Site Preparation Cost (KSh)
Site clearing, leveling, drainage
Testing/QC Cost (KSh)
Optional: Compaction testing, material testing
🪨 CALCULATE HARD CORE FILLING COST